Upcoming

Brazing SOM 3 - 60 - 62 Training (3 days)

Mon, 3 Aug 2026, 07:30 BST – Wed, 5 Aug 2026, 14:00 BST
Brazing SOM 3 - 60 - 62 Training (3 days)

SOM3-60 The preparation and completion of a brazing test consisting of 1 5/8" Copper Refrigeration brazed into a mild steel socket using manual torch flame in a horizontal position that is representative of all CAT 2 brazed connections .

SOM3-62 The preparation and completion of a brazing test assembly consisting of 1 1/8" Copper Refrigeration standard pipe into stainless steel tube using manual torch in a vertical down position that is representative of same material and orientation within Airedale .

Register

Contact us